  • Muck Away

    Hi,
    I am wanting a conversion please in tons for 780 sq mtrs to be dug out at 150mm, so how much will that be in lorry loads away and also stone back in ready for tarmac.
    This is for a Multi Use Games Arena in the UK

  • #2
    Re: Muck Away

    Originally posted by GLSPlay1 View Post
    Hi,
    I am wanting a conversion please in tons for 780 sq mtrs to be dug out at 150mm, so how much will that be in lorry loads away and also stone back in ready for tarmac.
    This is for a Multi Use Games Arena in the UK
    780 m x 0.15 m = 117 m "banked". The dirt when dug out will be loosened up and the stone will be delivered loose so expect an additional 10-15% volume loose. The density of dirt is HIGHLY variable depending on its composition and moisture content; I hesitate to guess the value. You may wish to weigh a sample of known volume. The stone is probably around 1.5 - 1.6 t/m if dry, approaching 2 t/m wet.